File #: TMP-9645    Version: 1 Name:
Type: Ordinance Status: Miscellaneous
File created: 2/21/2025 In control: Community Services Department
On agenda: 3/18/2025 Final action:
Title: Introduction and first reading of an ordinance amending the Washoe County Code at Chapter 110 (Development Code), article 610 Final Subdivision Maps, to modify various sections in order to clarify requirements related to final subdivision maps. These amendments include requiring each final map submission to contain a minimum of 5 lots and specifying what type of parcels count toward the 5 lot minimum; updating language to ensure compliance with the Nevada Revised Statutes; adding the requirement for a water supplier certificate on the final map when served by a general improvement district; providing that an acceptable financial assurance document may be utilized in lieu of a faithful performance bond; increasing the number of days for the initial final map submittal from 60 to 120 days prior to the final date to present the map to the Director of Planning and Building for signature; removing the requirement for a phasing plan; further clarifying the timing requirements for the present...
Attachments: 1. BCC 3-18-25 - Staff Report - WDCA24-0007 Article 610 - 1st Reading, 2. BCC 3-18-25 - Attachment A - Working Copy of Ordinance, 3. BCC 3-18-25 - Attachment B - PC Action Order and Signed Resolution, 4. BCC 3-18-25 - Attachment C - PC Staff Report for WCDA24-0007, 5. BCC 3-18-25 - Attachment D - Public Comment, 6. BCC 3-18-25 - Staff Presentation - WDCA24-0007 Article 610
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

Introduction and first reading of an ordinance amending the Washoe County Code at Chapter 110 (Development Code), article 610 Final Subdivision Maps, to modify various sections in order to clarify requirements related to final subdivision maps. These amendments include requiring each final map submission to contain a minimum of 5 lots and specifying what type of parcels count toward the 5 lot minimum; updating language to ensure compliance with the Nevada Revised Statutes; adding the requirement for a water supplier certificate on the final map when served by a general improvement district; providing that an acceptable financial assurance document may be utilized in lieu of a faithful performance bond; increasing the number of days for the initial final map submittal from 60 to 120 days prior to the final date to present the map to the Director of Planning and Building for signature; removing the requirement for a phasing plan; further clarifying the timing requirements for the presentation date for the first final map and all successive final maps; and updating the names or titles of public officers and agencies as well as the names or titles of certain referenced reports/studies and all matters necessarily connected therewith and pertaining thereto. And if supported, set a public hearing for the second reading and possible adoption of the ordinance for April 8, 2025. Community Services. (All Commission Districts.) FOR POSSIBLE ACTION