<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Washoe County - File #: TMP-12058</title><link>https://washoe-nv.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=8184196&amp;GUID=7FF4E47C-4E29-4FDC-B98D-1F361A218A16</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://washoe-nv.legistar.com/Feed.ashx?GUID=7FF4E47C-4E29-4FDC-B98D-1F361A218A16&amp;ID=8184196&amp;M=LD" rel="self" type="application/atom+xml" /><item><title>Washoe County - File #: TMP-12058</title><link>https://washoe-nv.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=8184196&amp;GUID=7FF4E47C-4E29-4FDC-B98D-1F361A218A16</link><guid isPermaLink="false">7FF4E47C-4E29-4FDC-B98D-1F361A218A16-2026-08-20-14-45-38</guid><description>Title: Recommendation to approve a construction change order for the Pleasant Valley Interceptor Reach 3 Project [in the amount of $1,158,641.55], increasing the Guaranteed Maximum Price 1 (GMP 1) contract amount by more than 5% to [a total of $7,697,515.50], for the substitution of 12-inch coated welded steel pipe and the installation of an 18-inch fiberglass reinforced sewer pipe.  Due to a greater installation depth and specific ground conditions, the work requires deeper bore pits, specialized shoring, and polymer manhole structures between stations 10+50 and 17+76. Additionally, the revised scope incorporates the installation of 740 feet of 12-inch coated welded steel pipe and 18- inch FRP pipeline due to changes in subsurface conditions associated with higher ground temperatures. Community Services. (Commission District 2.) FOR POSSIBLE ACTION</description><pubDate>Thu, 20 Aug 2026 14:45:38 GMT</pubDate></item></channel></rss>